Case studies

Please take a look at some of my previous projects. 
Please do not hesitate to get in touch to see if I can help with your upcoming project.

Polo arena Lincolnshire

HOLD YOUR HORSES! ANYONE FOR POLO SIR!

Pumping station installation

There is always a solution to any problem!

Drainage problem

What a wet, boggy, cold mess this one was!

Garden site clearance

Down in the jungle where nobody goes, there’s a Ultimate Plant digger battling through the undergrowth!

Farm cow shed base installation

We were tasked with tackling a muddy, messy farmyard drainage problem and level up an uneven cow shed.

School car park refurbishment

School’s out kids! UPA are coming to undertake the demolition of a school bike shelter along with associated groundworks at a school in Gainsborough.

Anaerobic digester clearance

UPA were contracted to carry out the removal of sludge from bioplant tanks, as a local contractor failed to successfully pump this out.

Demolition of DB Lawrence building / Sleaford standard office

The DB Lawrence Building has historical significance to Sleaford, being the head office for the Sleaford Standard Newspaper in a prominent position in the town centre.

Demolition of Lincolnshire Motors / New Holland dealership

Ultimate Plant were appointed to undertake the asbestos removal and demolition of the former Lincolnshire Motors building in Brigg.

Demolition and earthwork projects in Lincoln

UPA were contacted by a returning client who had been so impressed with our previous work, that he entrusted us with his own home, which was to be demolished and rebuilt.